CTDOT I-691 RESURFACING, BRIDGE REHABILITATION AND SAFETY IMPROVEMENTS

image
  • PROJECT

    CTDOT I-691 Resurfacing, Bridge Rehabilitation, and Safety Improvements

  • MARKETS

    Highway & Bridges
    Alternative Project Delivery
    Civil & Utility
    Concrete

  • CONTRACT TYPE

    Design Build Prime Contractor

  • PROJECT OWNER

    The Connecticut Department of Transportation

  • LOCATION

    Cheshire, Middlefield, Southington, Meriden, CT

  • AWARDS

    CMAA 2024 Project Achievement Award Infrastructure Over $30 Million

    Arthur W. Gruhn 2024 Excellence in Construction Challenging Project Award

Printable PDF

CTDOT Project 0079-0244  – I-691 Resurfacing, Bridge Rehabilitation and Safety Improvements was a major highway and bridge rehabilitation Design Build project aimed to improve travel conditions and increase safety for all users along the I-691 corridor from Meriden to Southington, CT. Manafort Brothers, Inc. was selected to make these critical repairs to the existing roadway and bridge infrastructure along I-691 under this Design Build contract.

Manafort’s scope of work included concrete pavement repairs, drainage improvements, bridge rehabilitation of 14 bridges, 17,000 SY of bridge deck waterproofing membrane replacement, illumination upgrades, new overhead highway signage, highway resurfacing and highway safety improvements along a 9 Mile stretch of   I-691 Eastbound and Westbound.

 

The Manafort Design Build Team engineered and constructed cross slope correction to meet current roadway design standards as well as roadside upgrades to meet current MASH Safety standards.

Manafort’s leadership throughout the design development, permit application phase, quality control plan implementation, coordination with all project stakeholders, and overall construction execution  led to the safe, successful, on-time, on-budget, and award-winning delivery of this design build project.